CompTIA A+ Core 2 · 220-1202
Objective 4.5: Environmental impacts and local controls
Try it now: 8 quick questions on this objective, no account needed.
Objective 4.5 · Environmental controls
1 / 8What device provides battery backup power to allow a graceful system shutdown during a complete power failure?
Practice questions for A+ Core 2 objective 4.5, “Environmental impacts and local controls.” Every question is original, written to the 220-1202 exam objectives, and comes with a full explanation — answer them below to see instant grading.
This objective sits in Domain 4.0: Operational Procedures, which is about 21% of the exam — so mastering it moves your readiness score meaningfully.
More 4.5 practice questions
Objective 4.5 · practice questions
1 / 5Why must CRT monitors be disposed of through approved e-waste programmes rather than regular refuse collection?
All 5 questions, with answers
1.Why must CRT monitors be disposed of through approved e-waste programmes rather than regular refuse collection?
- A.They contain high-value rare earth magnets that require specialist recovery
- B.They contain lead and other toxic materials in the glass that are hazardous to the environment
- C.Their high-voltage capacitors can cause fires in compactor trucks
- D.They are too physically large for standard refuse collection
Answer: B. They contain lead and other toxic materials in the glass that are hazardous to the environment. CRT monitors contain significant quantities of lead in the picture tube glass, along with other hazardous materials. When CRTs are crushed in landfills, these toxins can leach into soil and groundwater. Regulations in most jurisdictions require CRTs to be processed through certified e-waste recycling programmes.
2.A technician is setting up a small server room and wants to protect equipment from voltage spikes caused by lightning storms. The budget does not allow for a UPS. What is the minimum protection that should be installed?
- A.A standard power strip
- B.A surge protector rated for the equipment's wattage
- C.An isolation transformer
- D.A line conditioner with voltage regulation
Answer: B. A surge protector rated for the equipment's wattage. A surge protector contains components that absorb or divert voltage spikes, protecting connected equipment from damage caused by power surges. While not as comprehensive as a UPS, a quality surge protector rated appropriately for the load provides meaningful protection against common power events. A standard power strip provides no surge protection whatsoever.
3.A technician uses a chemical solvent to clean circuit boards but is unsure of its toxicity and disposal requirements. What resource should be consulted first?
- A.The equipment manufacturer's warranty card
- B.The MSDS/SDS for the solvent
- C.The IT department's acceptable use policy
- D.The vendor's change management documentation
Answer: B. The MSDS/SDS for the solvent. The Material Safety Data Sheet (MSDS/SDS) for any chemical contains all the information needed about toxicity, safe handling, required PPE, storage, and proper disposal methods. Consulting the SDS before use is both a legal requirement in many jurisdictions and a fundamental safety practice. It ensures technicians handle and dispose of chemicals in compliance with regulations.
4.A technician is about to dispose of old toner cartridges from a laser printer. What is the correct disposal method?
- A.Place them in the regular office trash
- B.Return them to the manufacturer or use a certified recycling programme
- C.Bury them in an approved landfill
- D.Incinerate them in a facility waste bin
Answer: B. Return them to the manufacturer or use a certified recycling programme. Toner cartridges contain fine chemical particles that are harmful to the environment and human health if improperly disposed of. Most manufacturers offer take-back programmes, and many office supply retailers accept used cartridges for recycling. Local regulations may also prohibit toner disposal in general waste.
5.A UPS alarm indicates that its battery capacity has dropped to 20% during a power outage, and the runtime remaining is less than 2 minutes. What should the technician do immediately?
- A.Continue working and trust that the UPS will sustain the system
- B.Initiate a graceful shutdown of all connected systems before the UPS is exhausted
- C.Disconnect the UPS to preserve battery life for a future outage
- D.Replace the UPS battery while the system is still running
Answer: B. Initiate a graceful shutdown of all connected systems before the UPS is exhausted. When a UPS signals critically low battery, the priority is to perform a controlled shutdown of all connected systems before power is lost entirely. An unexpected power cutoff when the UPS dies can cause data corruption, filesystem damage, and hardware failure. Most UPS units can be configured to trigger an automatic graceful shutdown when battery reaches a defined threshold.
Learn 4.5 and every other objective
Your A+ Core 2 path walks the whole exam in short stops, one objective at a time, and maps where you stand as you go.
Start my A+ Core 2 pathNo account needed to start.